There
were no accidents or injuries involving personnel at SQM’s productive
facilities.
|
·
|
The
Company’s productive operations were suspended yesterday due to the lack
of electricity from the Northern Power Grid and to the need to
perform
safety checks on the equipment. The electric supply was reestablished
early this morning.
|
·
|
Upon
preliminary inspection, no significant structural damages were
detected at
the productive plants. The railway system connecting María Elena to
Tocopilla suffered damages at specific points, and these damages
will be
repaired in the short term.
|
·
|
At
the Salar de Atacama, operations were partially restarted yesterday
using
an auxiliary electricity supply. Likewise, operations were restarted
at
the lithium carbonate plant in the Salar del Carmen, near
Antofagasta.
|
·
|
The
Company plans to gradually restart operations at the other facilities
during the day today.
|
·
|
Considerable
damage occurred to a great number of houses, as well as to the
hospital in
the town of María Elena.
|
·
|
SQM
has already begun the necessary work to enable the town of María Elena to
return to normal as soon as
possible.
|
·
|
Low
production costs based in vast and high quality natural
resources.
|
·
|
Know-how
and its own technological developments in its various production
processes.
|
·
|
Logistics
infrastructure and high production levels that allow SQM to have
low
distribution costs.
|
·
|
High
market share in all its core
products
|
·
|
International
sales network, with offices in more than 20 countries and sales
in over
100 countries.
|
·
|
Sales
synergies due to the production of a complete range of specialty
plant
nutrition.
|
·
|
Continuous
new product development according to the specific needs of its
different
customers.
|
·
|
Conservative
and solid financial position
|
SOCIEDAD QUIMICA Y MINERA DE CHILE S.A. | ||
|
|
|
Conf: | /s/ Ricardo Ramos | |
Ricardo Ramos R. |
||
Chief Financial Officer | ||
Date:
November
15,
2007
|